No shipping fees on orders above $35.

How to Install Invisible Kit LT01/LT02 to Make Railing Pretty?

How to Install Invisible Kit LT01/LT02 to Make Railing Pretty?

 Cable railings are admired for their sleek and modern appearance, and achieving a seamless, unobtrusive look is essential for enhancing the overall aesthetics. The Invisible Kit LT01/LT02 provides a solution to maintain the beauty of cable railings while ensuring a secure and discreet installation. In this article, we'll delve into the steps to install the Invisible Kit for cable railings, specifically LT01 and LT02, to achieve an aesthetically pleasing result.

 

Step 1: Gather the Necessary Tools and Materials

Before starting the installation process, gather the required tools and materials. This typically includes the LT01/LT02 Invisible Kit, cables, posts, anchors, tensioners, and any additional components specified by the manufacturer.

 

Step 2: Plan the Cable Layout

Carefully plan the layout of the cables, taking into consideration the design specifications and spacing guidelines provided by the manufacturer. Ensure accurate measurements and spacing between posts for a visually appealing result.

 

Step 3: Install Posts Securely

Properly install and secure the posts to the substrate. Ensure that the posts are anchored securely to prevent wobbling or movement, maintaining stability for the cable railing system.

 

Step 4: Attach the Invisible Kit Components

  • LT01 Installation:

    1. Attach the LT01 base to the post using suitable fasteners.
    2. Slide the cable through the LT01 base.
    3. Insert the LT01 cover, concealing the base and creating a clean, invisible appearance.
  • LT02 Installation:

    1. Secure the LT02 base to the post with appropriate anchors.
    2. Thread the cable through the LT02 base.
    3. Snap the LT02 cover into place, hiding the base and providing a seamless look.

 

Step 5: Tension the Cables

Use tensioners to achieve the desired tension in the cables. Ensure even tension across all cables to maintain uniformity and enhance both the appearance and structural integrity of the cable railing system.

 

Step 6: Trim Excess Cable

Carefully trim any excess cable, ensuring a neat and polished finish. Follow manufacturer guidelines for cable termination to prevent fraying and maintain a clean appearance.

 

Step 7: Regular Maintenance

Periodically inspect the cable railing system for any signs of wear, corrosion, or tension loss. Address any issues promptly to ensure the long-term beauty and functionality of the railing.

 

A Harmonious Blend of Form and Function

The installation of the Invisible Kit LT01/LT02 for cable railings is a meticulous process that requires attention to detail. By following these steps, you can achieve a cable railing system that seamlessly blends into its surroundings, offering both aesthetic appeal and structural integrity. Regular maintenance and adherence to manufacturer guidelines will contribute to the enduring beauty of your cable railing installation.